NCC 2019, Volume One (Version 1.1)

Public Comment Draft

The Public Comment Draft for NCC 2019, Volume One includes:

  • new quantified performance metrics and Verification Methods;
  • improved fire safety measures;
  • removing the ability to use bonded laminated material where a non-combustible material is required;
  • increased levels of energy efficiency for commercial buildings; and
  • improved readability, including standardised Governing Requirements across the NCC.

Version 1.1

Version 1.1 contains an additional row to Table E1.5 that requires sprinkler protection to Class 2 and 3 buildings and Class 4 parts of a building that are greater than three storeys in height yet less than 25m in effective height.

The public comment period for NCC 2019 closes COB Friday, 13 April 2018. Comments should be drafted using the response sheet and submitted using the online form.

Cover image: NCC 2019 Volume One Public Comment Draft Version 1.1

Related Resources