Skip to main content
  • ABCB
  • NCC Online
  • WaterMark
  • CodeMark
Home
  • Log in
  • Register
  • Reset password
Subscribe
  • About
    • The Board
    • ABCB Office
    • Building Codes Committee
    • Plumbing Code Committee
    • Business Plan
    • Transparency and engagement
    • Employment
  • Our Initiatives
    • Prefabricated, modular and offsite construction
    • Building Confidence Report – Model Guidance
    • Education
    • Fire safety
    • Livable housing
    • Condensation mitigation
    • Energy efficiency
    • Increased and competent use of performance
    • Plumbing Code research
    • WaterMark awareness
    • International relations
    • Improved NCC useability
    • Campaigns
  • News
  • Resource library
    • Calculators
    • Climate map
    • Corporate publications
    • Education and training
    • Guidance material and handbooks
    • Impact assessment
    • NCC CPD
    • NCC Micromodules
    • NCC Navigator
    • NCC Tutor
    • Promotional material
    • Reports, studies and papers
    • Specifications and notices
    • Standards and protocols
    • ABCB Data
  • Have your say
    • Consultation Hub
    • Final Regulation Impact Statements
  • NCBP
    • What are non-conforming building products?
    • What are the requirements for compliance and conformance?
    • What is my responsibility?
    • How do I ensure that I am using products that conform?
    • What do I do if I suspect a non-conformance?
    • Lodge a Query or report a suspected NCBP
  • Help & Support
  • Events

Breadcrumb

  1. Home
  2. Search

Search results

Stairways, barriers and handrails
/faq/stairways-barriers-and-handrails

Looking for clarity on stairway and balustrade requirements under the National Construction Code (NCC)? This section breaks down common questions about stairways, barriers, and handrails. We’ve designed these answers to…

Part 3.9.2 Barriers and handrails
/editions/2019/ncc-2019-volume-two/part-39-safe-movement-and-access/part-392-barriers-and-handrails
Appropriate Performance Requirements Appropriate Performance Requirements Where an alternative barrier is proposed as a Performance Solution to that described in Part 3.9.2, that proposal must comply with— Performance…
Part 3.9.2 Barriers and handrails
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-39-safe-movement-and-access/part-392-barriers
Appropriate Performance Requirements Appropriate Performance Requirements Where an alternative barrier is proposed as a Performance Solution to that described in Part 3.9.2, that proposal must comply with— Performance…
Part 3.9.2 Barriers And Handrails
/editions/2016/ncc-2016-volume-two/part-39-safe-movement-and-access/part-392-barriers-and-handrails
Appropriate Performance Requirements Appropriate : Where an alternative barrier is proposed as a Performance Solution to that described in Part 3.9.2, that proposal must comply with— Performance RequirementP2.1.1; and Performance…
Part 11.3 Barriers and handrails
/editions/ncc-2022/adopted/housing-provisions/11-safe-movement-and-access/part-113-barriers-and-handrails
11.3.1 Application 2019: 3.9.2.1 Compliance with this Part is achieved by complying with—…
Part 3.9.2 Barriers And Handrails
/editions/2016-a1/ncc-2016-volume-two/part-39-safe-movement-and-access/part-392-barriers-and
Appropriate Performance Requirements Appropriate : Where an alternative barrier is proposed as a Performance Solution to that described in Part 3.9.2, that proposal must comply with— Performance RequirementP2.1.1; and Performance…
2017 NCC Seminars: Can a handrail have a break at a landing?
/resources/videos/2017-ncc-seminars-can-handrail-have-break-landing

The 2017 NCC Information Seminars included a presentation on ‘Can a handrail have a break at a landing?’ as part 7 of the 13 part BCA sessions delivered throughout February and March 2017.

Survey Di Mazio Slip, trip and falls
/resource/report/survey-di-mazio-slip-trip-and-falls

This document is a summary of the research findings undertaken by Di Marzio Research, which was designed to identify the impact of the proposed BCA changes to the riser and going dimensions of stairs and the provision of handrails. The key aim of the…

Survey-Di-Mazio-slip-trips-falls.pdf (281.12 KB)
WA Part H101 Public buildings
/editions/2019-a1/ncc-2019-volume-one-amendment-1/western-australia/wa-part-h101-public-buildings
Note: Note: WA Part H101 contains Deemed-to-Satisfy Solutions for WA public buildings that are additional to those contained in Sections D, F and H. WA H101.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is…
WA Part H101 Public buildings
/editions/2019/ncc-2019-volume-one/western-australia/wa-part-h101-public-buildings
Note: Note: WA Part H101 contains Deemed-to-Satisfy Solutions for WA public buildings that are additional to those contained in Sections D, F and H. WA H101.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is…
Part H2 Public Transport Buildings
/editions/2016-a1/ncc-2016-volume-one/section-h-special-use-buildings/part-h2-public-transport
Note Note. Part H2 contains Deemed-to-Satisfy Provisions for Class 9b and Class 10 public transport buildings additional to those contained in Parts D3, E3 and F2 that apply to public transport buildings. H2.1 Application of Part…
Part H2 Public Transport Buildings
/editions/2016/ncc-2016-volume-one/section-h-special-use-buildings/part-h2-public-transport
Note Note. Part H2 contains Deemed-to-Satisfy Provisions for Class 9b and Class 10 public transport buildings additional to those contained in Parts D3, E3 and F2 that apply to public transport buildings. H2.1 Application of Part…
Part D2 Construction of Exits
/editions/2016-a1/ncc-2016-volume-one/section-d-access-and-egress/part-d2-construction-exits
D2.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsDP1 to DP6, DP8 and DP9 are satisfied by complying with— (i) D1.1 to D1.16, D2.1 to D2.25 and D3.1 to D3.12; and (ii) in a…
Part D2 Construction of Exits
/editions/2016/ncc-2016-volume-one/section-d-access-and-egress/part-d2-construction-exits
D2.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsDP1 to DP6, DP8 and DP9 are satisfied by complying with— (i) D1.1 to D1.16, D2.1 to D2.25 and D3.1 to D3.12; and (ii) in a…
Part H2 Public transport buildings
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-h-special-use-buildings/part-h2-public
Note: Note: Part H2 contains Deemed-to-Satisfy Provisions for Class 9b and Class 10 public transport buildings additional to those contained in Parts D3, E3 and F2 that apply to public transport buildings. H2.1 Application of Part (a…
Part H2 Public transport buildings
/editions/2019/ncc-2019-volume-one/section-h-special-use-buildings/part-h2-public-transport
Note: Note: Part H2 contains Deemed-to-Satisfy Provisions for Class 9b and Class 10 public transport buildings additional to those contained in Parts D3, E3 and F2 that apply to public transport buildings. H2.1 Application of Part (a…
Part D2 Construction of exits
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-d-access-and-egress/part-d2-construction
D2.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsDP1 to DP6, DP8 and DP9 are satisfied by complying with— (i) D1.1 to D1.16, D2.1 to D2.25 and D3.1 to D3.12; and (ii)…
Part D2 Construction of exits
/editions/2019/ncc-2019-volume-one/section-d-access-and-egress/part-d2-construction-exits
D2.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsDP1 to DP6, DP8 and DP9 are satisfied by complying with— (i) D1.1 to D1.16, D2.1 to D2.25 and D3.1 to D3.12; and (ii)…
Specification D3.10 Accessible water entry/exit for swimming pools
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-d-access-and-egress/specification-d310
1. Scope This Specification sets out the requirements for types of accessible water entry/exit for swimming pools. Intent To clarify that Specification D3.10 provides the design and installation details for accessible water entry/exit for…
Specification D3.10 Accessible Water Entry/Exit for Swimming Pools
/editions/2016-a1/ncc-2016-volume-one/section-d-access-and-egress/specification-d310-accessible
1. Scope This Specification sets out the requirements for types of accessible water entry/exit for swimming pools. Intent To clarify that provides the design and installation details for accessible water entry/exit for swimming pools. must be…

Pagination

  • Page 1
  • Page 2
  • Page 3
  • Page 4
  • Next page Next ›
  • Last page Last »

Areas of Interest

Content type

  • Show all (74)
  • NCC Page (69)
  • FAQ (1)
  • Resource (1)
  • Video (1)
  • (-) Article (2)

Domain

File type

Get the latest news and articles from the ABCB delivered straight to you. Subscribe to ABCB communications here

In the spirit of reconciliation the Australian Building Codes Board acknowledges the Traditional Custodians of country throughout Australia and their connections to land, sea and community. We pay our respect to their elders past and present and extend that respect to all Aboriginal and Torres Strait Islander peoples today.

Home

Info

  • Copyright
  • Privacy
  • Disclaimer
  • Accessibility
  • Help & Support

Find us on:

  • Facebook
  • LinkedIn
  • Youtube