Displaying 148 - 168 of 188

    This video discusses the fire hazard property requirements for floor coverings in Specification C1.10, and other NCC provisions that alter where a sprinkler system is installed.

    07.2021

    This video discusses if the concession within C1.5 can be applied when a basement carpark is present.

    07.2021

    This video discusses whether or not chain downpipes are compliant with the National Construction Code.

    07.2021

    This protocol assists organisations preparing or revising documents proposed for referencing in the NCC.

    07.2021 Protocol

    This report takes into account the particular instructions and requirements of our client.

    06.2021 Report

    Regulation Impact Statement for decision In November, the ABCB agreed to amend the NCC to require the construction of separate accessible adult change facilities (AACF) in public buildings includin

    Regulation Impact Statement for decision In November, the ABCB agreed to amend the NCC to require the construction of separate accessible adult change facilities (AACF) in public buildings includin

    Regulation Impact Statement for decision In November 2018, the ABCB agreed to implement changes to the NCC to improve energy efficiency in commercial buildings.

    Regulation Impact Statement for decision In November 2018, the ABCB agreed to implement changes to the NCC to improve energy efficiency in commercial buildings.

    Regulation Impact Statement for decision In November 2018, ABCB agreed to amend the Deemed-to-Satisfy (DTS) provisions of the National Construction Code to require fire sprinkler systems in new Cla

    Regulation Impact Statement for decision In November 2018, ABCB agreed to amend the Deemed-to-Satisfy (DTS) provisions of the National Construction Code to require fire sprinkler systems in new Cla

    Regulation Impact Statement for decision In November 2018, the ABCB agreed to implement separate heating and cooling load limits in the NCC for assessments subject to the Nationwide House Energy Ra

    Regulation Impact Statement for decision In November 2018, the ABCB agreed to implement separate heating and cooling load limits in the NCC for assessments subject to the Nationwide House Energy Ra

    Regulation Impact Statement for decision In May 2020, the ABCB agreed to include in the Governing Requirements of NCC 2019 Amendment 1 of the NCC a process for the development and documenting Perfo

    Regulation Impact Statement for decision In May 2020, the ABCB agreed to include in the Governing Requirements of NCC 2019 Amendment 1 of the NCC a process for the development and documenting Perfo

    Final Decision RIS This final Regulation Impact Statement (RIS) assesses the costs and benefits of requiring fire hose reels in (Class 5) office buildings.

    This Guide provides an explanation on the importance of early-stage analysis of proposals to change the NCC and gives detailed guidance on how to undertake a Preliminary Impact Analysis.

    06.2021 Template

    Report The ABCB commissioned Professor Mark Taylor, Macquarie University, to conduct a literature review of known causes that contribute to brass fittings leaching lead into drinking water.

    06.2021 Report

    Outcomes Report This report details the findings of the consultation process on a Scoping Study, Energy Efficiency: NCC 2022 and beyond.

    06.2021 Report

    This protocol outlines the 'regulatory gatekeeper' processes undertaken by the ABCB when considering proposals to change the NCC.

    06.2021 Protocol

    This report provides commentary on the cost implications of a range of proposed Deemed-to-Satisfy provisions emanating from the Emergency Egress for all Occupants Project.

    06.2021 Report